>> We don't need to wait too long for 2.6.5 though. A few months would be >> appropriate. MAL> Would it be reasonable to shorten that period, if the fix for the MAL> mentioned problem gets ready for prime time earlier ? I think it would be worthwhile to prioritize all outstanding bugs which have been mentioned in the context of 2.6.[345] and run a bug day with the top priority being to fix those bugs. If that task is completed, then move onto other stuff. Once those primary bugs are tackled schedule a 2.6.5 release. Skip
RetroSearch is an open source project built by @garambo | Open a GitHub Issue
Search and Browse the WWW like it's 1997 | Search results from DuckDuckGo
HTML:
3.2
| Encoding:
UTF-8
| Version:
0.7.4