A RetroSearch Logo

Home - News ( United States | United Kingdom | Italy | Germany ) - Football scores

Search Query:

Showing content from https://gitlab.com/gitlab-com/www-gitlab-com/-/merge_requests/140599 below:

Concise DAST job log output (!140599) · Merge requests · GitLab.com

Skip to content Concise DAST job log output

Team members for review and approval: Engineer(s): @hbakergitlab | Tech Writer: @phillipwells

Engineering Manager to merge when the feature is deployed and enabled: @twoodham

Important note on tier labels: Until further notice, due to change management reasons, please leverage label core to indicate 'free' tier in all code and templates.

Please review the guidelines for content block creation at https://handbook.gitlab.com/handbook/marketing/blog/release-posts/#content-blocks. They are frequently updated, and everyone should make sure they are aware of the current standards (PM, PMM, EM, and TW). There are separate (and slightly different) templates for primary and secondary features, bugs, removals, and upgrade notes. Please make sure to use the right template!

Please be aware deprecations follow a different process in a different project and you should not be using this MR template unless you are making edits to a release post prior to 14.4.

Links Key dates

If you need to make a change or addition to a release post item after 11:59PM PT on the Friday the milestone ends, open a new MR targeting the release-X-Y branch and assign to the Release Post Manager, with @mention of the lead Tech Writer and PMM. Please do not re-target the existing MR. Revisions for content in the release post branch should be made with new MRs targeted to the release post branch. It is important you follow the instructions on how to create a new MR to the release X-Y branch in Adding, editing, or removing merged content blocks after the Monday of release week and before the release date. It's highly recommended the PM connect with the release post manager to make sure content can still be added prior to creating the new MR.

Notes: Drafting release post content well in advance of the Monday of the week the milestone ends is highly recommended so reviews/revisions can happen in a rolling fashion and not bottleneck against the merge due date which is the Friday the milestone ends.

Getting ready for merge

Reminder: Make sure any feature flags have been enabled or removed!

Once all content is reviewed and complete, add the Ready label and set the Engineering Manager (EM) as the Assignee. The EM is responsible for merging as soon as the implementing feature is deployed to GitLab.com, after which this content will appear on the GitLab.com Release page and can be included in the next release post. All release post items must be merged on or before the Friday the milestone ends. If a feature is not ready by the due date of the Friday the milestone ends the EM should push the release post item to the next milestone.

PM release post item checklist Expand for Details

Please only mark a section as completed once you performed all individual checks!

Pricing theme updates for Premium and Ultimate primary features

This is required as part of the release post workflow. However, since review/alignment on this may take longer than the release post allows, please use a separate MR to de-couple timeline dependencies.

Expand for Details Review

When the above is complete and the content is ready for review, it must be reviewed by Tech Writing. It can also be reviewed by Product Marketing, Product Design, and the Product Leader for this area.

Use the Reviewers for Merge Requests feature in GitLab when adding team members for content reviews. Reviewers will then approve the MR and remove themselves from Reviewers when their review is complete.

Tip: Try using the Review App in this MR to see exactly how the release post item is rendered. This can help you catch issues that are harder to spot in YAML. Once this MR is merged, you can also see it on the release preview page prior to content assembly.

Tech writer review Expand for Details

After the technical writer from the corresponding group is added as a reviewer to this merge request, they will perform their review.

Please mark a section as complete only after you performed all individual checks!

Notes:

PMM review

PMM Review is Optional

Expand for Details

Please only mark this section as completed once you performed all individual checks! When your review is complete, please approve this MR and remove yourself from Reviewers.

EM release post item checklist Expand for Details

RetroSearch is an open source project built by @garambo | Open a GitHub Issue

Search and Browse the WWW like it's 1997 | Search results from DuckDuckGo

HTML: 3.2 | Encoding: UTF-8 | Version: 0.7.4