From Wikipedia, the free encyclopedia
No higher resolution available.
File historyClick on a date/time to view the file as it appeared at that time.
Date/Time Thumbnail Dimensions User Comment current 14:00, 13 August 2005 750 × 483 (110 KB) Hellisp The upper reservoir (Llyn Stwlan) and dam of the Ffestiniog Pumped Storage Scheme in north Wales. The four water turbines at the power station can generate 360 MW of electricity within 60 seconds of the need arising.<br> Taken by Adrian Pingstone in 1988 File usageThe following 10 pages use this file:
Global file usageThe following other wikis use this file:
This file contains additional information, probably added from the digital camera or scanner used to create or digitize it.
If the file has been modified from its original state, some details may not fully reflect the modified file.
RetroSearch is an open source project built by @garambo | Open a GitHub Issue
Search and Browse the WWW like it's 1997 | Search results from DuckDuckGo
HTML:
3.2
| Encoding:
UTF-8
| Version:
0.7.4