"Fred L. Drake, Jr." wrote: > That's right. But we definately determine the release schedule > without any regard for what else is on our schedule, and we don't make > changes to the schedule based on what gets added to our schedule > before we're done. That sounds wrong. However, I think there's still value in schedules. Without schedules things just don't get done, in my experience. --da
RetroSearch is an open source project built by @garambo | Open a GitHub Issue
Search and Browse the WWW like it's 1997 | Search results from DuckDuckGo
HTML:
3.2
| Encoding:
UTF-8
| Version:
0.7.4