Jeremy Hylton writes: > We consider both a set of functional goals and a release schedule. We > don't want to make these decisions in isolation. If there are N That's right. But we definately determine the release schedule without any regard for what else is on our schedule, and we don't make changes to the schedule based on what gets added to our schedule before we're done. Or that's been my perception at least. -Fred -- Fred L. Drake, Jr. <fdrake at acm.org> PythonLabs at Zope Corporation
RetroSearch is an open source project built by @garambo | Open a GitHub Issue
Search and Browse the WWW like it's 1997 | Search results from DuckDuckGo
HTML:
3.2
| Encoding:
UTF-8
| Version:
0.7.4